Lemcon Family

Twenty-Five Years of Delivery.
Now Leading the Philippines in Solar and EV.

Lemcon delivers turnkey infrastructure across the Philippines — solar power systems, EV charging networks, SiteConnect monitoring, and nationwide field operations from a single proven team.

Start a Project Inquiry
Lemcon headquarters — Biñan, Laguna
What We Deliver

Solar Power Systems

Off-grid, hybrid, and grid-tied solar for telecom, remote facilities, and commercial sites. Full turnkey from design to monitoring.

Solar Power

EV Charging Infrastructure

AC and DC charger deployment for commercial, fleet, and public sites. Turnkey delivery from site assessment to commissioning.

Electric Vehicles

Remote Site Monitoring

Fuel, power, site access, and safety. One dashboard across the national network.

SiteConnect
image-70001 Lemcon HQ — Biñan, Laguna assets/images/image-70001.jpg
Lemcon HQ

CCTV and WiFi

Enterprise surveillance and wireless networks for commercial and infrastructure sites.

Services
image-70002 Lemcon Headquarters — Biñan, Laguna assets/images/image-70002.jpg
Lemcon Headquarters

Delivery Models

BOT, Managed Services, As-a-Service, Design and Supply. Structured around client requirements.

Services

Civil and Structural Works

Courtyard construction, foundations, and site preparation nationwide.

Civil Works

Project enquiries, technical questions, and partnership discussions welcomed.

Contact

Single-Phase DC Fast Charging

30kW and 60kW DC on standard 220V single-phase. Reaches provincial sites three-phase chargers cannot serve.

EV Chargers
image-70003 Provincial DC charger install assets/images/image-70003.jpg
DC charger

Halisa AC Pedestal

Emergency stop, RCBO protection, thermal camera, flood sensor, and fire extinguisher. Built in as standard.

EV Chargers

EVIDA Compliance

Turnkey delivery for RA 11697 duties. Accredited Charging Station Service Provider.

Compliance
image-70004 SiteConnect dashboard at the NOC assets/images/image-70004.jpg
NOC dashboard

Starlink Backhaul Compatible

Plug-and-play Starlink support for off-grid telecom and remote sites across the islands.

SiteConnect

200+

EV charging sites deployed across all 82 provinces. National leader in delivery.

Milestone
image-70005 Halisa pedestal at an urban site assets/images/image-70005.jpg
Halisa pedestal

Built for the typhoons, built for the islands.

Heritage
Lemcon News and Views
22 May 2026

Lemcon Crosses 200 Site Milestone

Lemcon completed its 200th EV charging site, with deployments now active in all 82 provinces. The milestone confirms Lemcon as a national leader in EV infrastructure delivery.

EV Chargers
14 May 2026

Single-Phase DC Fast Charging Reaches Provincial Markets

The 30kW and 60kW DC units run on standard 220V single-phase supply, opening fast charging to towns without three-phase power.

EV Chargers
02 May 2026

EVIDA Compliance Programme Launched

Turnkey service covering Republic Act 11697 duties for new buildings, existing buildings, and fleet operators.

Compliance
24 April 2026

NOC Adds Regional Coverage

The Biñan NOC now coordinates dispatch across Davao, Cebu, Iloilo, Tuguegarao, Clark, Cagayan de Oro, and Laoag.

Operations
11 April 2026

Halisa Pedestal Adds Flood Sensor as Standard

Every Halisa AC pedestal now ships with flood sensor and thermal camera built in, adding protection in typhoon conditions.

EV Chargers
28 March 2026

Lemcon Confirmed as Charging Station Service Provider

Accreditation supports EVIDA-compliant delivery for clients across all 82 provinces.

Compliance
14 March 2026

SiteConnect Adds Starlink Backhaul

Plug-and-play Starlink support now ships with SiteConnect for off-grid telecom and solar sites across the islands.

SiteConnect
03 March 2026

Lifetime Workmanship Guarantee on Solar

Every Lemcon solar installation now carries a lifetime workmanship guarantee on the structural and electrical scope.

Solar Power
Articles and Long Reads

Why Single-Phase DC Fast Charging Matters for the Philippines

Three-phase power covers cities, but most provincial sites run only single-phase 220V. The case for serving 80 percent of the country with the supply that already exists.

EVIDA in Plain Language

Republic Act 11697 places duties on building owners, fleet operators, and developers. A clear summary of the law, who it touches, and how compliance works.

Designing Indoor Networks Where Signal Cannot Reach

Concrete, steel, and low-emissivity glass block external cellular. Inside coverage needs proper engineering, not just more antennas.

Twenty-Five Years on the Ground

A quarter century of national infrastructure delivery shapes the way Lemcon designs every project. The lessons that keep showing up.

Solar Power in Tropical Climates

European and temperate designs underperform in Philippine conditions. Tropical hardware, marine-grade balance of system, and typhoon-rated racking explain why.

Build, Maintain, Cleanup

A network does not stop at rollout. The case for treating maintenance and historical cleanup as parts of the same engineering discipline.

Tech Tips
01

Peak Sun Hours

Philippine cities capture 4.5 to 5.0 peak sun hours daily, ahead of historical European benchmarks.

02

NSCP Wind Load

Solar racking engineered to National Structural Code of the Philippines withstands sustained 320 kph wind loads.

03

EVIDA Mandate

New buildings with 20+ parking slots set aside roughly 5% for EV charging under Republic Act 11697.

image-60001 Square photo — SiteConnect Core unit on a wall mount. assets/images/image-60001.jpg
Lemcon image 60001
04

Single-Phase DC

Lemcon delivers 30kW and 60kW DC fast charging on standard 220V single-phase power.

05

25-Year Panel Warranty

Premium monocrystalline panels guarantee 80% of original output at year twenty-five.

06

24/7 NOC

Centralised Network Operations Centre tracks site state and dispatches field teams nationwide around the clock.

07

82 Provinces

Lemcon teams operate in every Philippine province with crews staged at regional offices.

image-60002 Square photo — Halisa pedestal at a forecourt. assets/images/image-60002.jpg
Lemcon image 60002
08

Halisa Safety Suite

Every Halisa AC pedestal ships with emergency stop, RCBO, thermal camera, flood sensor, and fire extinguisher.

01

Peak Sun Hours

Philippine cities capture 4.5 to 5.0 peak sun hours daily, ahead of historical European benchmarks.

02

NSCP Wind Load

Solar racking engineered to National Structural Code of the Philippines withstands sustained 320 kph wind loads.

03

EVIDA Mandate

New buildings with 20+ parking slots set aside roughly 5% for EV charging under Republic Act 11697.

image-60001 Square photo — SiteConnect Core unit on a wall mount. assets/images/image-60001.jpg
Lemcon image 60001
04

Single-Phase DC

Lemcon delivers 30kW and 60kW DC fast charging on standard 220V single-phase power.

05

25-Year Panel Warranty

Premium monocrystalline panels guarantee 80% of original output at year twenty-five.

06

24/7 NOC

Centralised Network Operations Centre tracks site state and dispatches field teams nationwide around the clock.

07

82 Provinces

Lemcon teams operate in every Philippine province with crews staged at regional offices.

image-60002 Square photo — Halisa pedestal at a forecourt. assets/images/image-60002.jpg
Lemcon image 60002
08

Halisa Safety Suite

Every Halisa AC pedestal ships with emergency stop, RCBO, thermal camera, flood sensor, and fire extinguisher.